UCLA Engineering VI Tops Out
February 2014
UCLA Engineering VI Tops Out
The MRY design team gathered with UCLA and Amoroso Construction (and their subcontractors) to celebrate the topping out of the concrete structure for Engineering VI Phase 1. The 5-story plus basement research laboratory building is scheduled for completion at the start of 2015.



